|
||||||||||||||||||
|
BAE
SYSTEMS
The items that were designed, installed and project managed by ourselves included:
|
The main mechanical plant which serves all areas of the building including the two cleanrooms was installed and commissioned by Skanska UK. We worked in conjuntion with Skanska to ensure that the correct volumes of air they were providing at the main plant corresponded with our design data to achieve the specified cleanliness levels and differential room pressures. In addition to the two cleanrooms, we were also responsible for designing the air conditioning and ventilation systems for fifteen RF screened rooms throughout the building. During October 2004, we carried out the final commissioning, testing and validation of the two facilities with the rooms being handed over to the client towards the end of 2004. |
|||||||||
|
the
company I our
services I design
I installation
I clients I projects
I validation
I contact us
copyright©2005 D&E Technical Services Ltd Tel: 01480 474430 Fax: 01480 386474 www.de-techservices.co.uk email: info@de-techservices.co.uk |
||||||||||